Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | YINDA |
Certification : | API 7K |
Model Number : | Triplex Mud Pump |
Price : | USD/CNY |
Delivery Time : | In stock |
Payment Terms : | T/T 30%DP, Balance before delivery |
Supply Ability : | In stock |
Crosshead Pin , Mud Pump Crossdead AH1301020403 RGF1000-04.10 RS11308A.04.014 GH3101-04.10 GH3161-04.13
Installing of Crosshead
1) Thoroughly clean all dirt or contamination and remove all burrs
or rough edges from OD of the crosshead, crosshead pin bores, and
inner bore of crosshead guide. Dry crosshead pin bore so taper bore
connection will make up metal to metal See Note.
2) Position “eye” of eccentric at the opening in the side of the
crosshead guide. Block eccentric strap so that crosshead will clear
the “eye” as it is sliding into position to where the crosshead pin
holes are in alignment. Refer. Fig 20.
3) Install the left hand crosshead first, rotate crankshaft
assembly to make “eye” into center crosshead and right hand
eccentric strap “eye” back, take down mud guard (1 in Fig.21), and
push right crosshead to the frame for enough space to install
Mid-crosshead and then right crosshead.
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 | |
HRSB | RSF-1300 | RSF-1600 | ||||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 | ||||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L | ||||
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 | ||||
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 | |
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT | ||||
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 | |
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 | |||
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place
order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the
most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we
issue you an PI for your confirmation. You will be requested to do
pr-e paid full payment or deposit before we go into production.
After we get the deposit, we start to process the order. We usually
need 15-25 days if we don't have the items in stock. Before
production has been finished, we will contact you for shipment
details, and the balance payment. After payment has been settled,
we start to prepare the shipment for you.
4) How do you take care when your clients received defective
products?
A: replacement. If there are some defective items, we usually
credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We
check the goods when they go into next step production procedure.
More customer view:6-TSCmudpumpparts1-yindapump.com.pdf
![]() |